If scrap is produced during processing, it can be entered in the output journal. Note that the scrap quantity does not increase the output quantity.
To post scrap manually
- In the Search box, enter Output Journal, and then choose the related link. 
- In the Posting Date field, enter the posting date. 
- In the Production Order No., enter the production order number. 
- In the Item No. field, select the item number. 
- In the Operation No. field, select the operation that you want to post the scrap to. 
- In the Run Time field, enter the time that was needed to process the scrap. 
- In the Scrapped Quantity field, enter the scrap quantity. 
- In the Scrap Code field, enter the scrap code. 
- If the warehouse location where the items should be put away uses bins but does not require put-away processing, assign a bin code to the journal line to specify where the items should be placed in the warehouse. For more information, see How to: Assign Bin Codes on Journal Lines. 
- Click Actions, Posting, Post to post the operations. 
|  Tip | 
|---|
| For more information about how to work with fields and columns, see Work with Data. For more information about how to find specific pages, see Search. | 





